Our Company
The Fleet
News & Events
Investor Relations
Careers
Responsibility
Response Home
Info
News
Internal Investigation
Public Report
BOP Video
AMF Video
Debris Retrieval
Contact
Internal Investigation
Public Report
Macondo Well Incident:
Transocean Internal Investigation
Report Files (PDF)
•
Macondo Well Incident: Transocean Investigation Report, Vol. I
(Full Version
, 74
MB
)
•
Macondo Well Incident: Transocean Investigation Report, Vol. II
(Full Version
, 195
MB
)
Adobe PDF files require Acrobat Reader to view.
Click here to download.
Video Summaries
•
Blow-Out Preventer (BOP)
•
Automatic Mode Function (AMF)
Internal Investigation Report by Chapter:
Executive Summary
Chapter 1: The Macondo Prospect and the
Deepwater Horizon
Chapter 2: Incident Chronology and Overview
Chapter 3: Incident Analysis
3.1 Well Design and Production Casing Cement
3.2 Temporary Abandonment
3.3 Drill
Floor Activities
3.4 Blow Out Preventer (BOP)
3.5 Gas Dispersion and Ignition
3.6 Muster and Evacuation
Chapter 4: Key Findings
Appendices:
Appendix A: Abbreviations and Acronyms
Appendix B: Macondo Casing Calculations
Appendix C: Testing of Cement Float
Appendix D: Centralization Plan at Macondo
Appendix E: Review of Macondo #1 7” x 9-7/8” Production Casing Cementation
Appendix F: Lock-Down Sleeve Decision
Appendix G: Hydraulic Analysis of Macondo #252 Well Prior to Incident of April 20, 2010
Appendix H: BOP Modifications
Appendix I: BOP Maintenance History
Appendix J: BOP Testing
Appendix K: BOP Leaks
Appendix L: Drill Pipe in the BOP
Appendix M: Structural Analysis of the Macondo #252 Work String
Appendix N: AMF Testing
Appendix O: Analysis of Solenoid 103
Appendix P:
Deepwater Horizon
Investigation: Gas Dispersion Studies
Appendix Q: Possible Ignition Sources
References:
Transocean Internal Investigation News Release
Transocean's Response to the U.S. Coast Guard Draft Report
Copyright © 2013 Transocean Inc. All Rights Reserved
Governance
/
Contact Info
/
Site Map
/
Search